Streets
The Town of Ault currently has about ten (10) linear miles of streets to maintain. Street repair and maintenance items are budgeted each year. The Town implemented a street fee in 2022 which generates approximately $65,000 a year. The Town has been able to resurface 6 block of streets in the past 3 years. The current cost for resurfacing a block of street (milling and resurfacing with 2-3 inches of new asphalt) is about $53,000.
Highway 85 and Highway 14 that run through Ault are maintained by CDOT, not the Town of Ault.
Highway 85 and Highway 14 that run through Ault are maintained by CDOT, not the Town of Ault.
Street Sweeping will take place the third Monday and Tuesday of each month, April through October. Please move your vehicles to allow the sweeping of the gutter pans in front of your address.
Monday: Streets and the Conestoga subdivision.
Tuesday: Avenues and the Highland Meadows subdivision.
Tuesday: Avenues and the Highland Meadows subdivision.